TR
İÇDAŞ Çelik Enerji Tersane ve Ulaşım San. A.Ş

İCDAS entered into energy sector initially by commissioning its first 135 MW power station to meet the energy needs of its own facilities in 2005. Seeing the supply deficit of Turkey in electrical energy production, ICDAS has strengthen its position in the energy sector by erecting 2 new 135 MW power stations in the following years, giving a grand total of 405 MW installed capacity.
 

İCDAS POWER PLANTS
In our power plants; fluidized-bed combustion technology is used, which is a clean coal technology. Coal is used as the main fuel and natural gas as auxiliary fuel in our plant. Coal is transferred from the stock area into the boiler through an enclosed conveyer belt system. Coal is burned inside the fluidized bed boiler with the addition of limestone. The gases emitted as a result of combustion pass through the electrostatic dust-holding filters and then directed to the chimney as dust-free. Besides achieving better coal burning with the fluidized bed combustion technology, the SO2 and NOx emissions remain below the desired limits in terms of environmental requirements due to the added limestone and the low burning temperature respectively.
 
 
 ICDAS has broken new grounds with the HEPSs installed on the cooling water return lines of each power plant in order to meet the internal requirements of them, and increased the production capacity by 3.6 MW with this efficiency project.

 

 

 

 

 

 

 Icdas Biga Wind Power Plant is planned to be constructed in the vicinity of Biga town of Canakkale on Kecibayiri Hill - Muhittin Hill - Zeytin Hill - Boz Hill - Hacidede Hill - Gulludere Hill -Kucukalan Hill – Ucyollar Site.Icdas Biga Wind Power Plant is currently in project stage; its licensed installed capacity is 60 MW and its annual production capacity stipulated in the license is 210.240.000 kWh.

Works are initiated for the project to be included in the voluntary carbon market by receiving Gold Standard Certificate. The Project expected to ensure approximately 113.530 Ton Carbon Emission Reduction.
 
 
POWER PLANT CAPACITY INFORMATION
POWER PLANTS COMMISSIONING CAPACITY ANNUAL PRODUCTION  
İÇDAŞ ÇELİK Fluidized Bed Power Plants

2005

3X135 MW 3.547.800.000 

kWh

İÇDAŞ Değirmencik HEPP

2012

3,656 MW 31.587.840

kWh

İÇDAŞ Biga Wind Power Plant

2014

30X2 MW

210.240.000

kWh

TOTAL:     3.789.627.840 kWh